- Flush, crisp and consistent finish
- A new level of control and consistency
- Minimalistic design
SA Solutions were approached by BAM Construction, who informed them that the seamless abutment products had been specified by David Chipperfield architects on the B2 Building at the new development in London’s Kings Cross.
SA Solutions were asked to supply SA14.30 skirting and SA16 Architrave sections for the creation of a flush, crisp and consistent finish. During the period in which the product was being supplied and installed by London City interiors, the products received a lot of interest, and as a result, went on to receive further specification on a number of other buildings on the Kings Cross development. Advised by the senior architectural consultants, Allies and Morrison included the same sections in their designs for the similar details on building B4.
Again, the finished continue to impress as the seamless abutment technology brings a new level of control, consistency with a crisp, flush and minimalistic design.